Coffer
Project
PROJECT
Overview
Location
& infrastructure
exploration
Targets
Exploration
roadmap
Coffer project
A Validated Uranium System with Room to Run
The Coffer Project gives Stallion exposure to a highly prospective part of the western Athabasca Basin, where regional structures, conductive trends, and alteration-style geophysical signatures create a strong foundation for continued uranium exploration.
42,075 Hectares
A sizeable land position in the southwestern Athabasca Basin, offering room for multiple target areas across one project.
100% Owned
Full project ownership gives Stallion flexibility to advance exploration, refine targets, and prioritize future drill programs
Multiple Target Zones
Appaloosa, Clydesdale, Holsteiner, and Mustang provide several distinct areas for follow-up exploration
Validated Drill Target
Initial drilling at Appaloosa intersected key structures, alteration and uranium-bearing indicators

Figure 1 - Coffer Project

Magnetic First Vertical Derivative
LOCATION & INFRASTRUCTURE
Access to advancement
Western Basin Exposure
Part of Stallion’s broader western Athabasca exploration portfolio
Highway Access
Accessible via Highway 955, supporting fieldwork, surveys, and drilling
Nearby Staging
Previous programs used accommodations apprx. 12 km from the drill area
Field-Ready Project
Past work includes ground geophysics, trail access, permitting, and drilling
Exploration targets
Four Targets With Momentum
The Coffer Project contains multiple target areas at different stages of advancement. Stallion’s work is focused on ranking these zones through geophysics, structural modeling, and follow-up drilling.
Appoloosa Target
The most advanced target at Coffer. Initial drilling intersected graphitic metasediments, alteration, and uranium-bearing structures, providing a foundation for follow-up targeting
Clydesdale Target
Defined by EM conductors and structural offsets. Future work is expected to refine the highest-priority drill locations.
Holsteiner Target
Located along an interpreted uranium corridor with conductor systems, crosscutting structures, and subtle resistivity features.
Mustang Target
Marked by basement conductors and structural intersections that may create favorable traps for uranium mineralization.
APPALOOSA TARGET
First-pass drilling confirms a prospective uranium system
Appaloosa was advanced from regional geophysics into ground-based surveying and diamond drilling. The maiden program confirmed key geological features, including graphitic basement rocks, alteration, and uranium-bearing structures, supporting continued target refinement.
2,798.2 metres
Completed across three diamond drill holes during the maiden drill program.
1,540 CPS
ANOMALOUS U
CF24-003 averaged 5 ppm U across the graphitic structure, with assays up to 14 ppm U.
Follow-Up Potential
Results provide vectors for future drilling along strike and up dip.

Figure 3 - Coffer Project
EXPLORATION ROADMAP
From Data to Drills
Coffer’s next phase is focused on refining target geometry, ranking priority zones, and advancing the strongest conductors toward additional drill testing.
Model the System
Integrate airborne EM, ground TDEM, magnetic, gravity, and drill data into a unified targeting model.
Rank the Targets
Prioritize Appaloosa, Clydesdale, Holsteiner, and Mustang based on structure, alteration, and conductor strength.
Refine Drill Locations
Use geophysical modeling and downhole data to sharpen target vectors before additional drilling.
Test Priority Zones
Advance the strongest targets through focused drill programs designed to evaluate uranium-bearing structures.
Qualified Person under NI 43-101
The technical information on this website have been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 ‐ Standards of Disclosure for Mineral Projects (“NI 43-101”) of the Canadian Securities Administrators. Under NI 43-101, the Qualified Person for this website is Darren Slugoski, P.Geo, Stallions’s Vice-President, Exploration, who has reviewed and approved its contents. Mr. Slugoski is a registered member of the Association of Professional Engineers and Geoscientists of Saskatchewan (APEGS).
Latest
Coffer
Project News
Stallion Uranium Confirms Uranium Presence in Graphitic Structure from Final Assay Results
August 7, 2024
Stallion Uranium Highlights Prospectivity of Intersected Conductive Structure at Appaloosa Target
June 12, 2024
Stallion Uranium Intersects Significant Conductive Structure
May 7, 2024
DISCOVER stallion uranium
Moonlite
Uranium Project
Explore Stallion’s flagship Athabasca Basin project and its high-priority uranium targets
Meet
The Team
Get to know the technical and leadership team advancing Stallion’s exploration plans
Investors
Access corporate materials, financial documents and key investor information