Project Highlights
Ideally Situated for Discovery
- Situated 12 km from the Key Lake Mine and 15 km southwest of the Millennium Deposit
- Hosts complex geological features interpreted in magnetics data
Infrastructure
- Close proximity to all-season roads.
- Proximal to electrical transmission lines
- Nearby Key Lake Mill
Overview
The 100% owned Ford Lake project is a highly prospective property that consists of 3 claims covering an area of 7,431 hectares near the margin of the Mudjuik and Wollaston Domain in the Eastern Athabasca Basin. It is located in shallow sandstone cover and approximately 12 km northwest of the Key Lake mine and 15 km to the southwest of the Millennium Deposit (104.9 million lb. of U3O8 combined indicated and inferred).
Exploration
A VTEMTM plus was completed on the property in winter 2023 to cover the entirety of the property. The company worked with Condor Consulting for advanced data processing. Magnetic Tilt data was released in the map shown below in Figure 2, also highlighting the proximinty to the recent uranium discovery by the Denison / Canalaska JV.
Figure 1 - Ford Lake Project Map
Figure 2 - Magnetic Tilt