TSX-V: STUD
Last: 0.03
Change: 0
Vol: 2,705,792
OTCQB: STLNF
Last: 0.02
Change: -0.00015
Vol: 69,344

Newlands Project

Project Highlights

Overivew

The 100% owned Newlands Project consists of one claim with a total area of 5,085 hectares situated in the southwestern Athabasca Basin. A VTEMTM plus was completed on the property in winter 2023 to cover the entirety of the property.

The project is located on the southern edge of the Clearwater Domain which is theorized to be the driver of uranium mineralization for the Patterson Corridor.

 

Subscribe to our Newsletter